Wind & Solar Controllers
Wire a Turbine Straight Onto a Battery Bank and you Either Cook the Batteries or Lose the Turbine in a Gale.
Mars Wind & Solar Hybrid MPPT Controller, LiFePO4, Wi-Fi & Colour Display
+8Regular priceFrom $450.00 AUDUnit PriceWind & Solar Hybrid Controller with Dump Load, 12/24V or 24/48V Auto
Regular priceFrom $360.00 AUDUnit PriceMPPT Hybrid Controller Wind & Solar 1kW 2kW 3kW & Dump Load Resistor
Regular priceFrom $439.00 AUDUnit PriceWCMD Pure-Wind MPPT Wind Charge Controller with Dump Load
Regular priceFrom $415.00 AUDUnit PriceHybrid MPPT Wind & Solar Controller 12V-48V, Bluetooth
Regular priceFrom $401.95 AUDUnit PriceWW Series Pure-Wind MPPT Wind Turbine Controller - 1 kW to 5 kW @48 V
Regular priceFrom $920.00 AUDUnit PriceWi-Fi Weather Station with Anemometer, Rain Gauge & Solar Sensor
Regular price $420.00 AUDUnit PricePure Sine Wave Inverter 3000W 4000W 5000W Peak - 12V or 24V
Regular priceFrom $499.95 AUDUnit Price300W Car Power Inverter Adaptor Multifunctional 12/24V
Regular priceFrom $116.95 AUDUnit Price48V to 12V Voltage Reducer DC-DC Step-Down Converter
Regular priceFrom $60.00 AUDUnit Price
Goes Well with
What a Hybrid Controller Does
It sits between the turbine, the panels and the bank, limits what the batteries are fed, and sheds the surplus into a dump load. A hybrid unit takes wind and solar into the one box, so the two sources are not fighting over the same battery.
Which One Suits your Build
| If you're Running | Pick | Why |
|---|---|---|
| 12V, 24V or 48V Bank | Auto-Sensing Hybrid MPPT | One Unit Covers All Three |
| Turbine & Panels Together | Wind & Solar Hybrid | Both Inputs, One Box |
| A Turbine on an Exposed Site | Controller with Dump Load | Brakes it When the Bank is Full |
| 240V Appliances Off the Bank | Off-Grid Hybrid Inverter | A Controller Never Makes 240V |
What These will Not Do
- Not Make More Wind: what you actually harvest depends on your own site, not on the controller.
- Not Size your System: cable, fusing and battery capacity come down to your run length and load.
- Not a Licensed Install: anything tying into a dwelling is an electrician's job.
What Else you'll Need
Wind turbines feed it, bus bars, breakers and Anderson plugs connect it safely, and solar panels cover the still days.
Free Standard Delivery on most of our range.Allow 5 to 10 working days from the date of your order. Allow 1–2 days for fulfilment.



